FacebooklinkedininstagramFacebooklinkedininstagram

Ryegate Fire District No. 2 Water System Improvements

 

East Ryegate, Vermont

Final design, bid phase, and construction phase services for community water system improvements to bring the system into compliance with the Water Supply Rule. The design included standby chlorine disinfection with retention tanks, master water meter, water main relocation/extension, and solutions for controlling and monitoring source vulnerable. Prepared contract documents, technical specifications, construction cost estimate, and Permit to Construct application. Coordinated with owner, Northeast Rural Water Association, and the Vermont Agency of Natural Resources throughout the duration of the project. Provided bid phase and contractor procurement assistance and periodic construction inspection services.

  • Ryegate Water System
  • Ryegate Water System Ryegate Water System

Related Projects