Green Mountain Power, Bellows Falls Substation Section 248

 

Bellows Falls, Vermont

DuBois & King was responsible for assisting Green Mountain Power in the preparation of a Section 248 application for a proposed new substation in Bellows Falls, Vermont. DuBois & King completed a study to evaluate possible sites for the new substation, identified a preferred alternative, and proceeded with regulatory activities to construct the new substation on the south side of Bridge Street in Bellows Falls. DuBois & King provided pre-file testimony services relevant to items of Section 248, including conducting a visual analysis. In addition, testimony on the following Section 248 activities was provided:

Alternatives evaluation
Wetlands
Headwaters
Soil Erosion
Waste Disposal
Educational services
Water conservation
Municipal services
Floodways
Rare and irreplaceable natural areas
Streams
Necessary wildlife habitat endangered species
Shorelines
Public health and safety

  • Bellows Falls Section 248
  • Bellows Falls Section 248 Bellows Falls Section 248
  • Bellows Falls Section 248 Bellows Falls Section 248