Oct 082015
Full-time office engineering with periodic construction inspection services over a 2-month period for an accelerated bridge replacement project for Bridge 93 on Vermont Route 30, including associated railroad track lowering. Project consisted of a new precast bridge substructure and superstructure with road subbase, stormwater drainage, street signage, pavement markings, and related roadway items. The railroad portion consisted of ballast removal, lowering of approximately 1,500 ft of track under the bridge and installing 340 new ties.